After one more lap checking for blisters the hull and bulwark were washed with soap and water. Tomorrow before beginning to fill we'll wash the areas again with acetone.
A few of the holes I'd drilled in the shoe were overflowing with water. After drying the holes out as best as possible with a paper towel, heat, via a heat gun, was they applied. The holes were then filled to the top with epoxy.
Learned from Phil to use a 1/4" nap roller to apply the Interlux 2000E as a thicker nap may leave ridges. The first coat of 2000E will use a lot more material than subsequent coats. The guesstimate was 2 gallons versus 1-1/4 for coats 2, 3, 4, and 5. Yea, five coats in all. Can put on two coats per day--about 8 hours between coats. The first coat will be white, then gray, then white... I'm thinking about running the 2000E right to the top of the bootstripe.
Tuesday, June 17, 2014
Monday, June 16, 2014
Sand and Wash--Part I
Washed the house, inner bulwark, and decks with soap and water.
As the fiberglass dries the remaining blisters become very apparent. Found about 10 that needed to be ground out.
The shoe was leaking rusty water from about five places. Per Tommy Chen's instructions, a 1/4" hole was drilled about 1/2" deep in the area where the water was manifesting itself.
As the fiberglass dries the remaining blisters become very apparent. Found about 10 that needed to be ground out.
The shoe was leaking rusty water from about five places. Per Tommy Chen's instructions, a 1/4" hole was drilled about 1/2" deep in the area where the water was manifesting itself.
Saturday, June 14, 2014
One more day...
Getting the bottom paint off from around the thruhulls was laborious and required a Dremel Tool with a small sanding drum.
Tomorrow we'll wash the hull with soap and water then wipe her down again with acetone.
Tomorrow we'll wash the hull with soap and water then wipe her down again with acetone.
Tuesday, June 10, 2014
The Gel Coat is Off
South winds have been rare as hens teeth this spring. They were blowing this morning so we got some time on Nellie. Phil had moved the stands and blocks giving us access to the only unfinished areas. After today's work there's just a little bit left around the through hulls to finish.
Among other things the picture shows the boot stripe and the black bottom paint below it. While the hull was being laid up it's pretty clear that the gel coat was applied at several different times because the barrier coat is below the gel coat in the lower part of this photo, and on top of the gel coat in the middle of the photo. Perhaps the white, below-the-waterline gel coat was put on first--but only to just above the waterline. Then the barrier coat was applied over the gel coat and stopped just a little farther up the hull than where the gel coat stopped. Finally, gel coat was sprayed the rest of the way up the bulwark. The straight line of gel coat in the picture shows that they taped off the lower part of the hull before spraying gel coat on the bulwark.
Monday, May 26, 2014
Complete Rough Sanding ... Check!
Another 1:20 hours today and all, we'll almost all, the gel coat is off. Asked Phil to move the stands and blocking so we can get the surfaces under them too. Still need to clean up around thruhulls too.
Dark and oozing blisters are very easy to spot on the sanded fiberglass hull. It's a simple matter to dig out the blister with the 24 grit paper we're using to sand the bottom.
As evidenced by the pictures below it seems seawater is penetrating voids in the shoe and working its way to the iorn ballast.
Dark and oozing blisters are very easy to spot on the sanded fiberglass hull. It's a simple matter to dig out the blister with the 24 grit paper we're using to sand the bottom.
As evidenced by the pictures below it seems seawater is penetrating voids in the shoe and working its way to the iorn ballast.
![]() |
| About a week after sanding the show, rust colored water stains it. |
![]() |
| An hour after sanding the stain off, drops of clear water appear. |
Thursday, May 22, 2014
Grinding, grinding, grinding...
Another two hours grinding on the bottom. Looks like just one more day grinding and we'll be on to the 'fill and fair' stage.
Monday, May 12, 2014
Starboard Side Completely Sanded? Check!
There's some progress to report. After 2:20 grinding on the hull today we finished the rough sanding on the starboard side. Yahoo!
| Clean starboard side bottom! |
| It feels good to make progress. |
With the end of grinding in sight it's time to start nailing down the products and processes we'll use to barrier coat the bottom Here's a page doing just that...
| A sample piece of the gel coat off the bottom mic's in at .027" |