Monday, August 3, 2020

Teak Deck Maintenance


All the teak pads on both the bow and dinghy deck got some TLC.  The perimeter of the pads was re-caulked with Teakdecking Systems SIS 440.


A sharp chisel makes fast work of seam topping.   New caulk was added as necessary to any seams with voids.  


No comments:

Post a Comment