In Go the Last Two Tanks

The last two tanks were put in place today. The floor joists were put back too. The new tanks each have a ball valve on the fill line. These were installed and all the new 1-1/2" fuel hose too. The USCG approved hose is expensive stuff at $9/ft. Nellie needed 17.5 feet.

IMG_1812.JPG

Tank 3, the starboard forward, went in without problems.

IMG_1813.JPG

Tank 4, the starboard aft, finds its home ok too.

IMG_1815.JPG

The floor joists going back into place and the fuel filler hoses too. Note the new ball valves for each tank.