Saturday, May 14, 2011

Bulbs, Batteries and Filters

Installed new spreader light bulbs. Charged the dinks battery and installed new connectors for the dinks sounder to battery connection. Installed new 2 Micron Racor filters and Cummins diesel filter. Sewed up screens for the pilothouses' two opening front windows.

Friday, May 13, 2011

Raw Water Impeller Self Destructs

New dodger. New impeller in both the Cummins and Onan. The Onan's impeller had completely disintegrated while the Cummins' was missing five of its vanes. Had to flush the raw water backwards to get the three pieces lodged against the oil cooler out. Rotated the downstairs AC unit. Much better air flow.

Thursday, May 12, 2011

Use GE SSG4000 to Bed Plexiglass into Stainless

Put new plexiglass on the stateroom's overhead hatch. Bedded the plexiglass in GE SSG4000 as recommended by the Piedmont Plastics, Ft Lauderdale. Time will tell if this product will work. A better and much more expensive choice would have been Sika 226 Cleaner, Sika 209 primer, Sikaflex 295UV Black. These Sika products are universally recommended but together cost $80 as compared to $15 for the SSG4000. Degreased the engine room and bilge.

Update:  22 May 2014--the SSG400 has really held up.  Not a single leak.  Highly recommend it.


Wednesday, May 11, 2011

Stern Light Relocated

Relocated the stern light about 8" higher so it's not hitting the dodger.
Relocated the stern light about 8" higher so it's not hitting the dodger.

Tuesday, May 10, 2011

Turbocharger Rebuild +

Rebuilt the Cummins turbocharger, replaced the injection elbow, and installed an Airsep.
Rebuilt the Cummins turbocharger, replaced the injection elbow, and installed an Airsep.

Thursday, May 5, 2011

New Cushions

New cushions for the salon settee and chairs. New cushions for the stateroom chair.

New Saloon Cushions

New cushions for the salon settee and chairs. New cushions for the stateroom chair.